Services

Everything inside the house, and most of what's outside it.

We are a general contractor, not a single-trade shop. That means one quote, one schedule and one crew lead for the whole renovation — whether it is a powder room or the entire main floor.

Renovated residential kitchen with new cabinetry and counters

01 · Kitchens

Kitchen renovations

The most disruptive room in the house, so we plan it hardest. Cabinets and counters are ordered and on site before demolition starts, which is what keeps a kitchen from turning into a three-month camping trip.

  • Custom and semi-custom cabinetry, islands and pantries
  • Quartz, granite and butcher-block counters, tile backsplash
  • Opening the kitchen into the living room, beam and permit included
  • Plumbing, electrical, pot lights and appliance rough-in

Typical timeline: 4–6 weeks on site

Renovated bathroom with tiled shower and new vanity

02 · Bathrooms

Bathroom renovations

Bathrooms fail from the inside out, so the part you never see is the part we care about most: waterproofing, slope, and a shower pan that was built once and built right.

  • Full down-to-the-studs rebuilds and tub-to-shower conversions
  • Schluter or membrane waterproofing with proper niches and curbs
  • Heated floors, exhaust upgrades and moisture-rated lighting
  • New powder rooms and basement bathrooms, including drainage

Typical timeline: 2–3 weeks on site

Finished basement living space

03 · Basements

Basement finishing & suites

The cheapest square footage you will ever add is the square footage you already own. Rec room, home office, or a legal second suite that pays part of the mortgage.

  • Framing, insulation, drywall, flooring and drop or flat ceilings
  • Legal second suites: egress windows, fire separation, separate entrance
  • Basement kitchens, bathrooms and wet bars
  • Waterproofing, sump and underpinning coordination where needed

Typical timeline: 6–10 weeks on site

Fully renovated bright interior after a whole-home renovation

04 · Whole home

Whole-home renovations

Full gut jobs, additions and older Toronto houses that need the layout rethought rather than redecorated. Phased so you know exactly which weeks are loud.

  • Layout changes, load-bearing walls and new beams
  • Rear and second-storey additions with engineered drawings
  • Full electrical and plumbing updates in older houses
  • Condo and townhouse renovations, including building approvals

Typical timeline: 10–16 weeks on site

Open-riser oak staircase and wide plank floors after renovation

05 · Flooring & carpentry

Flooring, stairs & carpentry

The finish work that decides whether a renovation reads as professional. Level subfloors, tight seams, and trim that meets in the right places.

  • Hardwood, engineered, vinyl plank, laminate and tile
  • Staircase rebuilds, new treads, railings and spindles
  • Baseboard, casing, crown, wainscoting and feature walls
  • Closets, built-in shelving and mudroom storage

Typical timeline: 3 days – 2 weeks

Interior painting and drywall finishing in progress

06 · Drywall & paint

Drywall, ceilings & painting

Popcorn ceilings scraped and skimmed flat, cracks fixed at the cause rather than filled, and paint that goes on after everything is masked — not around it.

  • Popcorn-ceiling removal and smooth-ceiling refinishing
  • Drywall repair, taping and Level 5 finishes
  • Interior painting: walls, ceilings, doors and trim
  • Water-damage and settlement-crack repair

Typical timeline: 2 days – 1 week

Exterior renovation of a detached home with a new deck

07 · Exterior

Decks, porches & exteriors

Outdoor work that survives a Toronto winter: proper footings below the frost line, flashing where it belongs, and materials chosen for freeze-thaw.

  • Decks, porches, pergolas and railings
  • Siding, soffit, fascia, eaves and exterior trim
  • Window and exterior-door replacement
  • Garages, sheds and separate-entrance stairwells

Typical timeline: 1–3 weeks

Questions

The things people ask on the first visit.

How long does a kitchen or bathroom renovation take?
A bathroom typically runs two to three weeks and a kitchen four to six, once materials are on site. Basements and whole-home renovations run six to sixteen weeks depending on permits and scope. We give you a dated schedule with the quote, not a vague range.
Do you handle permits?
Yes. When a job involves structural changes, a new bathroom, electrical or plumbing rough-in or a second suite, we arrange the drawings, pull the permit and meet the inspector. You do not deal with the city.
Is the quote actually fixed?
Yes. You get an itemised written quote with material allowances before demolition. The only things that change it are items you approve in writing, or genuine surprises behind a wall — knob-and-tube wiring, rot, an unsupported beam — and we show you those before we touch them.
Can we stay in the house during the renovation?
For single-room work, almost always. We build dust walls, protect floors and stairs, and clean up at the end of every day. For a full gut renovation we will tell you honestly when moving out for a few weeks is faster and cheaper for you.
What about payment?
A deposit to lock the schedule and order materials, then progress payments tied to completed stages — never to dates. The final payment comes after the walkthrough and after the deficiency list is done.
Which areas do you serve?
Toronto, Scarborough, North York, East York and Etobicoke, plus Markham, Richmond Hill, Vaughan, Thornhill, Mississauga, Brampton, Oakville, Pickering, Ajax, Whitby and Oshawa.

Not sure which of these you need?

That is what the free visit is for. We will tell you what the house actually needs first, and what can wait.